Black charred timber façade in a landscaped outdoor setting

Installation, care & weathering

Designed to age with character

Charred timber is a natural material that continues to respond to sunlight, moisture and its surroundings. Correct installation and considered maintenance allow it to weather beautifully while protecting its performance for years to come.

Step 01

Before installation

  1. 01

    Store boards flat

    Store horizontally on a flat surface, in a dry, well-ventilated and sheltered area, protected from direct sunlight, rain and ground moisture.

  2. 02

    Keep 20 cm off the ground

    Boards must be stored at least 20 cm above ground level.

  3. 03

    Allow acclimatisation

    Allow the timber several days to acclimatise before installation, particularly during periods of extreme humidity or dryness.

  4. 04

    Keep packaging on — but ventilated

    Protective packaging should remain intact until shortly before installation. Boards must not be stored in fully sealed or non-ventilated packaging for extended periods, as condensation may occur.

  5. 05

    Lift, never drag

    Handle finished faces carefully and lift boards rather than sliding them across one another. Never place a brushed face directly against another finished face.

  6. 06

    Lay out ten boards first

    Spread at least ten planks before fitting and match them for grain, colour and texture — every plank is unique.

Charred boards handled in the Inflamed factory

When calculating quantities, include an additional allowance of approximately 10–15% for cutting and installation waste.

Source: Installation Guide v1.02 · Quick User Guide

Step 02

Installing the cladding

Choose your cladding orientation to see the correct ventilated substructure and installation sequence.

Cutaway — layer order
Interior / structureExteriorVentilated cavity min. 20–30 mmAir outlet (top)Air inlet (bottom)
Front view — board orientation
Vertical board orientation

Complete assembly

Vertical cladding requires a double-batten substructure. Install the first battens vertically over the breather membrane to create a continuous drainage and ventilation cavity. Fix horizontal counter-battens over the vertical battens, then fix the vertical cladding boards to the horizontal counter-battens.

The air must move continuously from the protected inlet at the bottom to the outlet at the top through the open spaces between the first vertical battens.

This diagram shows the general ventilated construction principle. Final batten dimensions, fixing centres, membranes, flashings and structural fixings must be confirmed for the selected profile, building design and local regulations.

This guidance does not replace project-specific engineering or architectural advice. The final façade build-up must be confirmed by the project's architect, engineer or qualified installer.

Fixing the boards

  • A2 stainless steel — standard environments

    Only high-quality stainless steel fixings suitable for exterior timber cladding should be used. A2 stainless steel screws for standard environments.

    Installation Guide v1.02

  • A4 stainless steel — coastal and humid

    A4 stainless steel screws for coastal or high-humidity environments.

    Installation Guide v1.02

  • Two screws at every fixing point

    Two screws should always be used at every fixing point. A single fixing may allow boards to twist, cup, warp or move excessively over time.

    Installation Guide v1.02

  • Straight, consistent fixing lines

    All screws should be installed in perfectly straight and consistent lines, set out with a laser alignment system or a tensioned string line between the two ends of the facade section.

    Installation Guide v1.02

  • Level heads, never overdriven

    Screw heads should finish level with the plank — not driven inside it and not standing proud. Overdriving may damage the charred or brushed surface.

    Quick User Guide

  • Pre-drill where splitting is a risk

    Pre-drilling is recommended near board ends, when using hardwood species, during installation in colder weather and wherever a splitting risk exists.

    Installation Guide v1.02

Quick User Guide reference: two stainless steel screws every 500–600 mm; 42 mm screws for 20 mm thick planks, approximately 40 screws per m².

Do

  • Wear clean gloves when possible.
  • Lift boards individually rather than sliding them.
  • Protect finished surfaces from tools and rough contact.
  • Remove metal filings and construction debris from the facade immediately.
  • Treat cut ends created during installation to minimise moisture penetration.

Avoid

  • Dragging boards across one another.
  • Placing tools directly on finished surfaces.
  • Stacking brushed or finished faces directly against one another.
  • Overdriving fixings.
  • Installing wet boards or working against a wet substrate.

Cut ends: sawn ends may be burned with a gas torch (optional) and should be treated with wood oil. If you are unsure which method applies to your finish, contact Inflamed before treating the ends.

Step 03

A surface that evolves with its surroundings

Close view of a charred timber surface showing natural grain and tonal variation
  • Colour fading
  • Silvering
  • Gradual tonal variation
  • Surface texture changes
  • Limited release of small carbon particles from deeply charred surfaces in the early period after installation

These changes are natural properties of timber and shall not be treated as defects. Slight expansion, contraction and minor surface checking are likewise natural.

Maintenance intervals by finish

Maintenance requirements vary according to timber species, finish and exposure. Select your timber and finish to view the indicative re-oiling interval and recommended care instructions.

Choose your finish

0510152025

Approximately every 5 years

Years

Inspection
Inspect the façade at least once a year for surface damage, splitting, coating deterioration or discolouration beneath the coating, which could indicate moisture penetration.
Cleaning
Clean the surfaces if necessary, never with a pressure washer, and let the timber dry completely before any coating.
Re-oiling
Brushed and oiled surfaces expose more grain and need a periodic maintenance coat of the matching oil to preserve colour and protection. Re-oil earlier if the surface shows significant colour loss or coating deterioration; if it remains in good condition, maintenance may be carried out toward the later end of the interval.

Source: Inflamed indicative guidance

Maintenance intervals are indicative and may vary according to project conditions. Inspect the façade regularly and contact Inflamed if you are uncertain about the condition of the surface.

Annual checklist

  • Inspect colour and overall surface condition.
  • Look for splitting, coating deterioration and impact damage.
  • Check that stainless steel fixings remain tight.
  • Inspect cut ends and any exposed timber.
  • Check areas around openings, corners and flashings.
  • Clean gutters and downpipes.
  • Repair leaks that repeatedly wet the cladding.
  • Record areas that may require local treatment.

Cleaning and maintenance

  1. 01Inspect the surface carefully for damage.
  2. 02Remove loose dirt carefully — never use a pressure washer, as it can damage the coating.
  3. 03Allow the timber to dry fully.
  4. 04Apply the correct finish-specific maintenance product.
  5. 05Work evenly, in the direction of the grain.
  6. 06Remove excess oil immediately with a cloth or sponge.
  7. 07Allow the surface to dry according to the product instructions.

Required working conditions

  • Timber moisture content below 20% (below approximately 18% for Brushed Black Larch).
  • Minimum temperature +5 °C.
  • Relative humidity below 80%.
  • No rain or surface moisture during the required drying period.
  • Avoid oiling in direct sunlight — too rapid drying compromises the oil coating.

Step 04

Damage and spot repairs

What has happened to the board?

Not sure what you are looking at? Send us photographs of the board and we will tell you what to do.

Download centre

The guides behind this page

  • Installation Guide

    Instructions for use and assembly of charred wood cladding: storage, ventilation, supporting structure, fixings and handling.

    English · PDF · Updated v1.02

  • Maintenance Guide

    General maintenance of charred wood: yearly examination, maintenance plan, charred layer products, working conditions and resin discharge.

    English · PDF · Updated 2024

  • Quick User Guide

    Supplementary quick reference for loading, unloading, stacking, cut ends and screw quantities.

    English · PDF · Updated 2024

  • Black (Brushed) Larch — Maintenance Plan

    Product-specific plan: routine inspection, maintenance oiling every 10–12 years, spot repairs and the factors influencing the cycle.

    English · PDF · Updated 2025